Nuisance Tripping of Circuit Breakers (True RMS Measurements)

Nuisance tripping of circuit breakers is a common problem in many commercial and industrial installations. This Application Note explains the need to use true RMS measurement instruments when troubleshooting and analyzing the performance of a power system.

Nuisance tripping of circuit breakers is often caused by the load current being distorted by the presence of harmonic currents drawn by non-linear loads. Harmonic currents distort the current waveform and increase the load current required to deliver energy to the load. Many measurement instruments, even quite modern ones, use an averaging measurement technique that does not measure harmonic currents correctly. The readings may be as much as 40% too low, and circuit breakers and cable sizes may be underrated as a result.

True RMS meters, which take the complete distorted waveform into account, should be used instead.

Application Note Author & Publisher: Leonardo ENERGY

Source files for this application note

Related POST

Power Quality Data Interchange Format (PQDIF)- An Idea Whose Time Has Come!

The essence of life is in the connected world and collaborations. The exchange of information and a ..

Read more

Improving Energy Efficiency through Better Power Quality A Reality Check!

If your focus is energy savings, is it a good idea to invest in solutions to improve PQ? Can PQ solu..

Read more

Interactive Workshop on Power Quality and Harmonics at Pune

APQI and MSEDCL jointly hosted a full day interactive workshop on Harmonics and Power Quality at Pun..

Read more

Interactive Workshop on Power Quality and Harmonics at Mumbai

APQI and MSEDCL jointly hosted a full day interactive workshop on Harmonics and Power Quality at Mum..

Read more

Voltage Dip and Financial Impact

Power Quality issues can be broadly classified as voltage quality and current quality issues. Curren..

Read more

Power Quality in India - is the glass half-full or half-empty?

As the industries and workplaces open-up after post-covid-19 and day to day operations resume with ..

Read more

14th Webinar - Business case for Loss Reduction using advanced Volt-VAR control in Indian grid

22nd February, 2018 (Thursday) - India's power grid system is massive and needs re-balancing to deal..

Read more

kVAh Billing - Understanding the Benefits

13th August, 2021 (Friday) - This webinar will throw light on the 4 key issues which could be drivin..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.