Case Study of HT Reactor failure? A Resonance Phenomenon in 11KV Water Pumping Station

ABSTRACT

A booster pumping station (BPS) in South India with high power HT pumping motors reported sudden failures due to flashover of the current limiting reactors of the PF correction capacitor circuit. The pumping circuit has its own power factor correction capacitor circuits. The failures were reported repeatedly over three/ four days during December 2009. Extensive re?look on design aspects and simulations studies pointed out no major design issues. Finally it was concluded that the failures were due to the inherent design and workmanship limitations of the reactors itself to handle transient over currents during switching. To find out the specific reasons for such failures (which happened after three to four years’ of working), it was decided to undertake power quality studies. With the long duration of logging at identified points it was noted that at certain random periods , the voltage and current total harmonic distortions increases abnormally high. It was also noted that the predominant harmonic content was the 13th. Detailed investigations provided the reason for such random failures due to the resonance situation in the Pf compensation LC circuit which resonates at 13th harmonic.This has lead to shunt resonance situation for the LC circuit resulting into the failure of the reactor. Larger sized current limiting reactors were found to be the best and economical solution in this case.

DOWNLOAD RESOURCES

CS31-ENGG-2012-Case-Study-of-Ht-Reactor-Failure.pdf

Related POST

Impact of Electric Vehicles on Power Quality

Today energy efficiency is a top priority, boosted by a major concern with climatic changes and by t..

Read more

Power Quality (PQ) Issues in Warehouses

From the outside, Warehouses may appear to be a quiet, uneventful and simple places to manage. But i..

Read more

Power Week 2016

Designed for the global electric power & energy industry, POWER WEEK provides 5 days of networking o..

Read more

IUKAN 2nd Annual Conference 2014

APQI joined as Power Quality Partner during the 2nd Annual I-U-KAN conference 2014 focusing on compl..

Read more

Reactive Power Related Issues and Capacitors Failure in an Urban Call Centre

A call center in a metro city was faced with problems of unreliable operation due to higher degree o..

Read more

Evaluation of Effect of Non-Linear Loads on In plant Distribution System for Expansion of an Automobile Industry

The modern electronic controllers are added in the industries for having refined control for the pro..

Read more

12th Webinar Manage your assets downtime through better understanding of PQ Issues

05th October, 2017 (Thursday) - In today's uncertain economic climate, capital and operational bud..

Read more

13th Webinar - Smart Grid viability for Indian Distribution Companies

19th December, 2017 (Tuesday) - The electricity distribution industry is facing unprecedented arra..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.