Reactive Power Related Issues and Capacitors Failure in an Urban Call Centre

ABSTRACT

A call center in a metro city was faced with problems of unreliable operation due to higher degree of harmonic amplification with the existing APFC Capacitors, which caused its frequent failures. The standard, unchoked capacitors in the APFC System offered very low impedance to harmonic currents thus acting as sink for higher frequency components. Hence, considering the amplification characteristics of the existing Capacitors and the basic nature of loads like UPS, Air conditioners and Lighting Systems in the network, it was necessary to find a suitable solution to the issue. After a detailed study and analysis of the key parameters, a solution of a Reactive Power Compensation with Harmonic Blocking filters to prevent any failure of capacitors, was recommended. However the solution was not implemented due to the perceived ‘high cost’ and the problems used to affect the system operation only occasionally by the center.

DOWNLOAD RESOURCES

CS10-ITITES-2009-Reactive-Power-Related-Issues-and-Capacitors-Failure-in-an-Urban-Call-Centre

Related POST

Role of PQ Analyzers in improving Power Quality - an Expert's View

If you can't measure it, you can't manage it" - one of the most important quotes in management, cred..

Read more

Energy Storage Technology For Performance Enhancement of Power Systems

Todayís energy world is at a turning point. Resources are depleting, pollution is increasing and the..

Read more

Seminar on Harmonics Regulations and Case Studies at Coimbatore

A session with The South India Spinners Association on Harmonics Regulations and Case Studies at Coi..

Read more

Interactive Workshop on Power Quality and Harmonics at Pune

APQI and MSEDCL jointly hosted a full day interactive workshop on Harmonics and Power Quality at Pun..

Read more

Case Study of HT Reactor failure? A Resonance Phenomenon in 11KV Water Pumping Station

A booster pumping station (BPS) in South India with high power HT pumping motors reported sudden fai..

Read more

Managing problems in earthing affecting critical equipment - By addressing UPS Installation / Floating neutral

Out of various power quality parameters like harmonics, flicker, transients, voltage sags and swells..

Read more

kVAh Billing - Understanding the Benefits

13th August, 2021 (Friday) - This webinar will throw light on the 4 key issues which could be drivin..

Read more

1st Webinar Business Case For Power Quality Investments By Indian Power Distribution Utilities

17 June, 2014 (Thursday) - Loss reduction, one of the foremost Business performance metrics, drive..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.