Reactive Power Related Issues and Capacitors Failure in an Urban Call Centre

ABSTRACT

A call center in a metro city was faced with problems of unreliable operation due to higher degree of harmonic amplification with the existing APFC Capacitors, which caused its frequent failures. The standard, unchoked capacitors in the APFC System offered very low impedance to harmonic currents thus acting as sink for higher frequency components. Hence, considering the amplification characteristics of the existing Capacitors and the basic nature of loads like UPS, Air conditioners and Lighting Systems in the network, it was necessary to find a suitable solution to the issue. After a detailed study and analysis of the key parameters, a solution of a Reactive Power Compensation with Harmonic Blocking filters to prevent any failure of capacitors, was recommended. However the solution was not implemented due to the perceived ‘high cost’ and the problems used to affect the system operation only occasionally by the center.

DOWNLOAD RESOURCES

CS10-ITITES-2009-Reactive-Power-Related-Issues-and-Capacitors-Failure-in-an-Urban-Call-Centre

Related POST

Are Developing Economies at Risk Due to Power Quality Issues and Challenges?

The importance of high power quality (PQ) electricity supply has never been greater than it stands t..

Read more

De Mystifying PQ: Interrelation with Power Supply Reliability, AT&C Losses, Energy Efficiency

The Indian electricity network is undergoing considerable change that is brought about by new techno..

Read more

One Day Workshop on Power Quality Note for HT Industries, 28th September 2019 at Madurai - Highlights

Using electrical energy optimally without impact on productivity is the essential need of all indust..

Read more

Seminar on Electrical Utility Management

Issues like Electrical Safety , Power Quality, and Reliability are becoming a priority among Electri..

Read more

Power Quality Concerns For Energy Efficient Economy

Power Quality and Reliability is the key to successful delivery of quality product and uninterrupted..

Read more

Grounding Issues and Noise

ABSTRACT Electrical noise is one of the common power quality issues that affect commercial and indu..

Read more

18th Webinar - kVAh Billing - the 4 things you must know to optimize energy bills

30th July, 2020(Thursday) - After implementation of the kVAh tariff structure by MSEDCL in April 202..

Read more

11th Webinar PQ Audit The right choice to ensure power system performance

23rd February, 2017 ( Thursday) - Today's IoT driven and power electronics based economy relies ..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.