Reactive Power Related Issues and Capacitors Failure in an Urban Call Centre

ABSTRACT

A call center in a metro city was faced with problems of unreliable operation due to higher degree of harmonic amplification with the existing APFC Capacitors, which caused its frequent failures. The standard, unchoked capacitors in the APFC System offered very low impedance to harmonic currents thus acting as sink for higher frequency components. Hence, considering the amplification characteristics of the existing Capacitors and the basic nature of loads like UPS, Air conditioners and Lighting Systems in the network, it was necessary to find a suitable solution to the issue. After a detailed study and analysis of the key parameters, a solution of a Reactive Power Compensation with Harmonic Blocking filters to prevent any failure of capacitors, was recommended. However the solution was not implemented due to the perceived ‘high cost’ and the problems used to affect the system operation only occasionally by the center.

DOWNLOAD RESOURCES

CS10-ITITES-2009-Reactive-Power-Related-Issues-and-Capacitors-Failure-in-an-Urban-Call-Centre

Related POST

Simplifying PQ Assessment Using Artificial Intelligence

Power Quality (PQ) assessment requires simultaneous observation of multiple parameters and continuou..

Read more

Innovations in PQ Interventions

Power Quality is one of the major issues in electricity distribution segment today. It is an issue, ..

Read more

8th IEEE GCC Conference & Exhibition at Muscat, Oman

The 8th IEEE GCC conference and exhibition will be held from the 1st to 4th of February in Sultan Qa..

Read more

Power Quality Solution through Harmonics Distortion Correction for Corporate Head Office Building

An Indian electricity utility has mandated to limit harmonic distortion starting from the year 2012,..

Read more

Auxiliary Networks and Devices

This white paper is one of a series of thematic white papers covering various aspects of electrical ..

Read more

7th Webinar How to calculate Electric Losses due to poor PQ?

27th November, 2015 (Thursday) - In our increasingly digital economy, maintaining power quality i..

Read more

17th Webinar - Regulatory and Policy Landscape around PQ for more resilient grid in 21st Century

12th June, 2018(Tuesday) - India's 21st century electricity grid is becoming smarter with the help o..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.