Power Quality Issues & Solutions at a Tyre Manufacturing Facility

ABSTRACT

A leading tyre manufacturing company in India was facing PQ problems due to lower factor of the system due to non-linear loads present in the system.

A leading tyre manufacturing company in India was facing problems due to lower power factor of the system due to non-linear loads present in the system. Real time PF correction system (RTPFC) installed to maintain unity power factor on the LT system helped overcome the problem of high kVA demand, high harmonic and lower PF, with improved stability of the system.

DOWNLOAD RESOURCES

Power Factor Maintenance at a Tyre Industry

Related POST

Keeping High Speed, Metro Rail Safety and Performance on Track Good Power Quality is the Driver

Metro Rails are all set to take the center stage of mass urban transportation in India's fastest-gro..

Read more

Business Case for PQ Investment by Commercial Buildings

According to total electricity sales (as per 2011-12), around 54% of the energy produced in India is..

Read more

2nd India Backup Power Executive Summit and Awards Banquet 2013

Frost & Sullivan's 2nd India Backup Power Executive Summit and Awards Banquet 2013 aimed to bring un..

Read more

One Day Workshop on Power Quality in Textile Industry, 20th July 2019 at Coimbatore - Highlights

”Good PQ means Good Business”. In textile industry the energy efficiency drive and reduced cost of p..

Read more

Power Quality In Paper Industry

Pulp and Paper Industry is one of the most energy and water intensive industries. On national level,..

Read more

Practical Applications of Electrical Conductors

This white paper focuses on the two metals that offer high electrical conductivity at economically v..

Read more

12th Webinar Manage your assets downtime through better understanding of PQ Issues

05th October, 2017 (Thursday) - In today's uncertain economic climate, capital and operational bud..

Read more

18th Webinar - kVAh Billing - the 4 things you must know to optimize energy bills

30th July, 2020(Thursday) - After implementation of the kVAh tariff structure by MSEDCL in April 202..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.