Managing problems in earthing affecting critical equipment - By addressing UPS Installation / Floating neutral

ABSTRACT

Out of various power quality parameters like harmonics, flicker, transients, voltage sags and swells, earthing is one of the critical aspect that needs to be addressed in correct manner. When it comes to proper functioning of critical equipments, earthing becomes vital ingredient. In addition to earthing of equipments, earthing of neutral also plays very important role in safety of the personnel and equipment.

Neutral also plays very important role in safety of personnel and equipments. A disconnected or floating neutral can cause catastrophic incidents particularly in single phase loads. Typically in an industry critical single phase loads are connected through an UPS system. An UPS is provided in the system for reliable and quality power supply to the critical equipment. If installed UPS in not earthed properly, then it can cause damage to loads connected through the UPS.

DOWNLOAD RESOURCES

CS41-ENGG-2014-Managing-problems-in-earthing-affecting-critical-equipment-By-addressing-UPS-Installation-Floating-neutral.pdf

Related POST

Transient Over-voltages in Power System Causes, Types And Effect On Power Quality

The biggest problem with transients in the electrical networks is that very few recognize it as a pr..

Read more

Power Quality (PQ) And Electromagnetic Compatibility (EMC) Issues

Digitization is one of the drivers to improve efficiency, reliability and quality of the electrical ..

Read more

SEEM National Energy Management Awards (SNEMA 2020)

APQI is glad to be associated with SEEM, it's National Support Network (NSN) Partner, as Knowledge P..

Read more

POWERMAX 2017

The One and Only international events in the center of Business and Busiest city" Jakarta would be h..

Read more

UNEP Survey Report Power Quality for Indonesia, Thailand and Vietnam

Electric power quality (PQ) disturbances can have significant economic consequences for many differe..

Read more

UPS Power System Design Parameters

This application note is intended to be a source of guidance and to help reduce confusion pertaining..

Read more

14th Webinar - Business case for Loss Reduction using advanced Volt-VAR control in Indian grid

22nd February, 2018 (Thursday) - India's power grid system is massive and needs re-balancing to deal..

Read more

3rd Webinar Incorporating Power Quality (PQ) Performance Parameters In Distribution Regulation

10th December, 2014 (Wednesday) - With reforms and much needed infrastructure investments going i..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.