A PV solar plant of 40MW capacity is established in Dhursar, Rajasthan, India. The DC output from individual solar panels is converted to AC through inverters. Inverter outputs are summed up and the consolidated output is stepped to 33kV with 380V / 33kV transformers. The transformers feed 33kV bus of switchyard through over head lines. In the switchyard, 33kV voltage is further stepped up using two numbers 220/33 kV Step UP Transformers (SUTs). A 32KM overhead line, owned by Power Plant Operator, connects Dhursar 220kV substation to Deechu substation of State utility (Grid).

Author: Dr Rajamani – APQI NSN Partner ; Article Published in special PQ issue in IEEMA Journal, June 2016.

Download and read the full article.

DOWNLOAD RESOURCES

Article on Parallel operation of transformers with large non-identical taps for reactive power compensation

Related POST

Conventional And Modern Methods To Mitigate Harmonics

The world is moving towards digital era where its sustainability depends upon the electrical and dig..

Read more

Unlocking the value in the volume of PQ Data

PQ Data, whether its voltage disturbances, current unbalance or any such other critical parameter, i..

Read more

APQI 6th Regional Partners Annual Meeting

APQI 6th Regional Partners Annual Meeting to be held at InterContinental Hanoi Westlake, Hanoi-Vietn..

Read more

National Seminar on Total Power Quality Management

Asia Power Quality Initiative (APQI) announces to hold a seminar on Total Power Quality Management w..

Read more

Improving Reliability in a Data Centre

A sophisticated, state-of-the-art data center calls for a highly secured physical environment in add..

Read more

Nuisance Tripping of Circuit Breakers (True RMS Measurements)

Nuisance tripping of circuit breakers is a common problem in many commercial and industrial installa..

Read more

7th Webinar How to calculate Electric Losses due to poor PQ?

27th November, 2015 (Thursday) - In our increasingly digital economy, maintaining power quality i..

Read more

1st Webinar Business Case For Power Quality Investments By Indian Power Distribution Utilities

17 June, 2014 (Thursday) - Loss reduction, one of the foremost Business performance metrics, drive..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.