Reduction in kVAhBilling through Harmonic Mitigation

This case study presents a case study for a plant who are billed on kVAh basis and having considerable share of non linear load. By reducing harmonics in the system, the plant has reduced their kVAh consumption resulting in reduced operating cost. Apart from reduced operating cost they also have increased reliability of system and reduced failure.

Additional Info