Neutral Sizing in Harmonic Rich Installations

Both national and international standards for the conductor sizing of cables do not adequately take into account the additional heat load arising from harmonic currents. Some standards prescribe the maximum current values for four-conductor and five-conductor cables under the assumption that only two or three conductors are loaded. However, today’s harmonic situations may give rise to the fourth conductor (neutral) being fully loaded or even overloaded simultaneously with a balanced load on the three phase conductors. Other standards provide a general instruction that under a particular harmonic impact on the phase conductors, a certain additional load has to be taken into account for sizing the neutral conductor. However, the practitioner will usually not know how much harmonic impact arises from a particular load or group of loads.

In the following application note, an approach will be given to estimate the additional thermal impact due to harmonic currents in the LV power supply system of a building. Based on this estimation, it provides a methodology on how to dimension and select three-phase cables that are supposed to feed single-phase final circuits containing distorting loads.

The Highlights from this publication:

  • The harmonic impact on the neutral current can be substantial. Cables have to be over-dimensioned accordingly.
  • Assuming that all harmonics accumulate in the neutral results in an approach that falls on the safe side.
  • It is good to keep this safety margin, because similar loads can have a very different harmonic behaviour.
  • It is also good to provide some reserve for imbalance coming on top of the harmonics.

DOWNLOAD RESOURCES

Application Note - Neutral Sizing in Harmonic Rich Installations

Related POST

Conventional And Modern Methods To Mitigate Harmonics

The world is moving towards digital era where its sustainability depends upon the electrical and dig..

Read more

Role of PQ Analyzers in improving Power Quality - an Expert's View

If you can't measure it, you can't manage it" - one of the most important quotes in management, cred..

Read more

Public Private Partnerships (PPP) Financing, Projects & Contracts

Asia Power Quality Initiative (APQI) India is pleased to join hands as a media partner with Infocus ..

Read more

Power Quality Issues & Solutions at a Tyre Manufacturing Facility

A leading tyre manufacturing company in India was facing PQ problems due to lower factor of the syst..

Read more

Power Quality Problems And New Solutions

In this paper, the main Power Quality (PQ) problems are presented with their associated causes and c..

Read more

12th Webinar Manage your assets downtime through better understanding of PQ Issues

05th October, 2017 (Thursday) - In today's uncertain economic climate, capital and operational bud..

Read more

14th Webinar - Business case for Loss Reduction using advanced Volt-VAR control in Indian grid

22nd February, 2018 (Thursday) - India's power grid system is massive and needs re-balancing to deal..

Read more
Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
There seems to be some problem with validating your request. Please try again.
Thank You! Your message has been delivered.